The objective of the assignment is to identify interventions needed to strengthen the institutional structure/systems/processes of EPDCL to address the existing challenges as
well as the emerging needs of the business given the rapid growth expected in the power sector in coming years to meet the PFA objective; and to prepare an IT Implementation Roadmap to guide the Discom to move towards smart grid enabled systems.
Expression of Interest Deadline: 17-Sep-2015 at 11:59:59 PM (Eastern Time – Washington D.C.)
See full tender here: #1198293 Andhra Pradesh Power Transmission and Distribution Network Augmentation Project
eConsultant2 website: https://wbgeconsult2.worldbank.org
Tender notification: # 1198293
Assignment Countries:
- India
You must be logged in to post a comment.